Ameritech Contracting LLC: VA HVAC and plumbing contracts
Ameritech Contracting LLC (UEI CADSMUE9J2M4) has won 141 VA heating, cooling and plumbing contracts since October 2018, worth $35.5 million, at 20 locations. 13 are still active.
Where does Ameritech Contracting LLC work for the VA?
- West Haven, CT: 80 contracts
- Augusta, ME: 15 contracts
- Leeds, MA: 10 contracts
- Newington, CT: 7 contracts
- Manchester, NH: 5 contracts
- West Roxbury, MA: 4 contracts
- Sidney, ME: 3 contracts
- Brockton, MA: 2 contracts
- Bedford, MA: 2 contracts
- Providence, RI: 2 contracts
- White River Junction, VT: 2 contracts
- Berlin, CT: 1 contract
- Fresno, CA: 1 contract
- Hines, IL: 1 contract
- Danville, IL: 1 contract
- Dayton, OH: 1 contract
- North Chicago, IL: 1 contract
- Dublin, GA: 1 contract
- Marion, IN: 1 contract
- Hamden, CT: 1 contract
Contracts
| Contract | Description | Location | Obligated | Start | End |
|---|---|---|---|---|---|
| 36C24126N0934 | Plumbing blanket purchase agreement condensate pump removal and replacement | Leeds, MA | $112,599 | Sep 21, 2026 | Nov 20, 2026 |
| 36C24126P0688 | Fire suppression and steam leak repairs | Newington, CT | $64,599 | Sep 14, 2026 | Dec 13, 2026 |
| 36C24126N0925 | Boiler removal | Brockton, MA | $26,997 | Sep 14, 2026 | Dec 13, 2026 |
| 36C24126N0817 | Plumbing blanket purchase agreement | Leeds, MA | $50,481 | Aug 31, 2026 | Oct 30, 2026 |
| 36C24126P0483 | Header valve replacement | Newington, CT | $99,599 | Jun 10, 2026 | Jul 25, 2026 |
| 36C24126N0551 | Ct mechanical SATOC - HVAC and plumbing - replace AHUS building 27/34 project 689-26-105 | West Haven, CT | $529,360 | Jun 5, 2026 | Dec 5, 2027 |
| 36C24126N0591 | Plumbing BPA | Newington, CT | $249,599 | Jun 1, 2026 | Nov 30, 2026 |
| 36C24126N0550 | Ct mechanical SATOC - HVAC and plumbing replace AHU SICU-7 | West Haven, CT | $848,500 | May 29, 2026 | Jun 3, 2027 |
| 36C24126N0584 | Plumbing BPA | West Haven, CT | $68,599 | May 28, 2026 | Aug 27, 2026 |
| 36C24126N0462 | Ct mechanical SATOC - HVAC and plumbing - loading dock HVAC, project 689-26-104 | West Haven, CT | $63,252 | May 12, 2026 | Sep 14, 2026 |
| 36C24126N0417 | Plumbing BPA | West Haven, CT | $71,599 | Mar 23, 2026 | Jun 22, 2026 |
| 36C24126N0394 | Plumbing BPA | West Haven, CT | $79,599 | Mar 20, 2026 | Jun 19, 2026 |
| 36C24126P0269 | Steam coil replacement | West Haven, CT | $63,599 | Mar 16, 2026 | Jun 15, 2026 |
| 36C24126P0257 | Newington bei corrections | Newington, CT | $120,349 | Mar 6, 2026 | Oct 31, 2026 |
| 36C24126N0293 | Plumbing BPA | Newington, CT | $57,866 | Feb 4, 2026 | Apr 3, 2026 |
| 36C24126P0178 | Water tank isolation valve replacement | Berlin, CT | $59,722 | Jan 26, 2026 | Jul 25, 2026 |
| 36C24126N0157 | Ct mechanical SATOC - HVAC and plumbing | West Haven, CT | $293,715 | Jan 14, 2026 | Oct 11, 2026 |
| 36C24126N0134 | Plumbing BPA | West Haven, CT | $45,934 | Dec 10, 2025 | Aug 17, 2026 |
| 36C26126P0082 | Repaire boiler valves | Fresno, CA | $111,124 | Nov 19, 2025 | Feb 23, 2026 |
| 36C25226C0001 | 578-25-013 (ifb-con) Joliet VFD replacement | Hines, IL | $494,000 | Oct 24, 2025 | Jul 13, 2026 |
| 36C25225C0061 | Replace an air handling unit (AHU) | Danville, IL | $317,304 | Oct 16, 2025 | Oct 16, 2026 |
| 36C25025C0158 | Replace steam line B115/118/400 | Dayton, OH | $2.8 million | Oct 9, 2025 | Jul 17, 2026 |
| 36C24125P0930 | Chilled water upgrade | West Haven, CT | $249,980 | Sep 26, 2025 | May 26, 2026 |
| 36C24125C0077 | 402-22-755 laundry HVAC | Sidney, ME | $5.2 million | Sep 25, 2025 | Jul 10, 2026 |
| 36C25225C0052 | Construction project 556-24-106 replace chiller no. 2 at captain james a. lovell federal health care center north Chicago, il 60064-3048 | North Chicago, IL | $2.1 million | Sep 11, 2025 | Oct 31, 2026 |
| 36C24125N1363 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | Leeds, MA | $78,650 | Sep 1, 2025 | Dec 31, 2025 |
| 36C24125N1310 | Plumbing BPA | West Haven, CT | $85,414 | Aug 29, 2025 | Aug 28, 2026 |
| 36C24125N1278 | Plumbing BPA | West Haven, CT | $68,409 | Aug 22, 2025 | Dec 22, 2025 |
| 36C24125N1099 | Plumbing BPA | West Haven, CT | $292,314 | Aug 6, 2025 | Aug 5, 2026 |
| 36C24125N1096 | Plumbing BPA | West Haven, CT | $163,241 | Aug 6, 2025 | Aug 5, 2026 |
| 36C24125N1175 | Plumbing BPA | West Haven, CT | $11,440 | Jul 25, 2025 | Sep 25, 2025 |
| 36C24125P0632 | Saddle taps | West Haven, CT | $21,924 | Jun 30, 2025 | Oct 30, 2025 |
| 36C24125N0919 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Roxbury, MA | $248,900 | Jun 9, 2025 | May 31, 2026 |
| 36C24125N0918 | Plumbing and steam fitting | West Roxbury, MA | $199,100 | Jun 9, 2025 | May 31, 2026 |
| 36C24125N0978 | Plumbing BPA | West Haven, CT | $20,713 | Jun 9, 2025 | Dec 8, 2025 |
| 36C24125N0934 | Plumbing BPA | West Haven, CT | $154,203 | May 27, 2025 | Jul 30, 2025 |
| 36C24125N0792 | Plumbing BPA | West Haven, CT | $35,673 | Apr 18, 2025 | Apr 17, 2026 |
| 36C24125N0796 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | Bedford, MA | $49,000 | Apr 16, 2025 | Apr 25, 2025 |
| 36C24125N0538 | Brockton VAMC boiler plant building 40, emergency high pressure relief/safety valves replacement project | Providence, RI | $299,600 | Mar 31, 2025 | May 30, 2026 |
| 36C24125N0627 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | Providence, RI | $234,334 | Mar 31, 2025 | Mar 30, 2026 |
| 36C24125N0682 | Plumbing BPA | West Haven, CT | $59,360 | Mar 28, 2025 | Mar 27, 2026 |
| 36C24125N0697 | Plumbing BPA | West Haven, CT | $31,689 | Mar 28, 2025 | Mar 27, 2026 |
| 36C24725C0041 | Chillers | Dublin, GA | $1.8 million | Feb 1, 2025 | Mar 15, 2026 |
| 36C24125N0471 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $150,000 | Jan 28, 2025 | Jan 27, 2026 |
| 36C24125N0389 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $203,180 | Jan 10, 2025 | Sep 10, 2025 |
| 36C24125N0372 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $175,000 | Dec 27, 2024 | May 27, 2025 |
| 36C24125N0357 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $32,986 | Dec 27, 2024 | Mar 28, 2025 |
| 36C24125N0365 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $150,000 | Dec 24, 2024 | May 24, 2025 |
| 36C24125N0314 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $58,966 | Dec 13, 2024 | Jun 12, 2025 |
| 36C24125N0263 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $186,554 | Dec 5, 2024 | Feb 28, 2025 |
| 36C25024C0162 | Replace sps air handler and install humidification system 610-23-501 | Marion, IN | $1.5 million | Nov 5, 2024 | Oct 27, 2026 |
| 36C24125N0138 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $41,660 | Nov 1, 2024 | Oct 31, 2025 |
| 36C24125N0083 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $25,000 | Oct 19, 2024 | Oct 31, 2024 |
| 36C24125N0068 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $74,675 | Oct 17, 2024 | Feb 17, 2025 |
| 36C24124P1035 | Steam pipe replacement | West Haven, CT | $1.4 million | Sep 20, 2024 | Oct 31, 2024 |
| 36C24124N1372 | Plumbing and steam fitters for VISN 1 | West Roxbury, MA | $98,736 | Sep 18, 2024 | Mar 31, 2025 |
| 36C24124N1340 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $112,430 | Sep 13, 2024 | Sep 12, 2025 |
| 36C24124N1301 | BPA order - boiler plant steam leaks & piping repairs | Brockton, MA | $196,587 | Sep 9, 2024 | Dec 19, 2024 |
| 36C24124N1320 | Blue tank heater repair | West Haven, CT | $191,415 | Sep 6, 2024 | Sep 5, 2025 |
| 36C24124N1319 | Clinical tube bundles | West Haven, CT | $189,220 | Sep 6, 2024 | Sep 5, 2025 |
| 36C24124P0832 | Boiler plant preventative maintenance | West Haven, CT | $547,668 | Sep 1, 2024 | Aug 31, 2027 |
| 36C24124N1200 | Plumbing and steam line repair | West Haven, CT | $106,750 | Aug 16, 2024 | Dec 17, 2025 |
| 36C24124P0848 | Glycol unit installation | Leeds, MA | $63,964 | Aug 14, 2024 | Aug 13, 2025 |
| 36C24124P0877 | Steam pipe repair | Hamden, CT | $99,522 | Aug 12, 2024 | Sep 3, 2024 |
| 36C24124P0875 | Fire alarm room HVAC | Manchester, NH | $51,224 | Aug 9, 2024 | Nov 8, 2024 |
| 36C24124N1088 | Steam coil replacement | West Haven, CT | $123,352 | Aug 4, 2024 | Aug 3, 2025 |
| 36C24124N1091 | Replacement of condensate pumps | West Haven, CT | $78,980 | Aug 4, 2024 | Aug 3, 2025 |
| 36C24124N1107 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | Augusta, ME | $125,856 | Aug 1, 2024 | Oct 31, 2024 |
| 36C24124N1082 | Air conditioning repairs and replacement | Manchester, NH | $38,362 | Aug 1, 2024 | Jul 31, 2025 |
| 36C24124N1097 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | Augusta, ME | $169,390 | Jul 29, 2024 | Oct 28, 2024 |
| 36C24124P0805 | Medical air & vacuum service | White River Junction, VT | $32,472 | Jul 29, 2024 | Oct 28, 2024 |
| 36C24124N1072 | Sanitary plumbing replacement | West Haven, CT | $94,121 | Jul 26, 2024 | Jul 25, 2025 |
| 36C24124N1105 | Steam pipe repair | West Haven, CT | $75,691 | Jul 24, 2024 | Jul 23, 2025 |
| 36C24124N1043 | Elevator pit steam leak repairs | West Haven, CT | $78,510 | Jul 12, 2024 | Jul 11, 2025 |
| 36C24124N1042 | Bldg. 1 plumbing repairs | West Haven, CT | $59,265 | Jul 12, 2024 | Jul 11, 2025 |
| 36C24124N0983 | Multitask chiller repair | West Haven, CT | $75,112 | Jun 30, 2024 | Jun 29, 2025 |
| 36C24124N1008 | Red bag cooler repair | West Haven, CT | $22,757 | Jun 30, 2024 | Jun 29, 2025 |
| 36C24124N0913 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $61,676 | Jun 21, 2024 | Jun 20, 2025 |
| 36C24124N0869 | Domestic water line repair | West Haven, CT | $46,489 | Jun 15, 2024 | Sep 30, 2024 |
| 36C24124N0850 | Condensate pump replacement | West Haven, CT | $185,290 | Jun 14, 2024 | Jun 13, 2025 |
| 36C24124N0868 | Cooling coil replacement | West Haven, CT | $114,950 | Jun 14, 2024 | Sep 30, 2024 |
| 36C24124N0892 | CH&P, VFD replacement | West Haven, CT | $20,940 | Jun 10, 2024 | Jun 9, 2025 |
| 36C24124P0582 | Airflow testing and balancing | West Haven, CT | $705,240 | Jun 1, 2024 | May 31, 2026 |
| 36C24124N0804 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $39,152 | May 14, 2024 | Sep 30, 2024 |
| 36C24124N0792 | Backflow preventer repair | Newington, CT | $26,800 | May 3, 2024 | Jul 12, 2024 |
| 36C24124N0727 | Sewer leak in hospital | West Haven, CT | $99,990 | Apr 17, 2024 | May 16, 2024 |
| 36C24124N0653 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $38,104 | Apr 5, 2024 | Jun 5, 2024 |
| 36C24124N0561 | Waste pipe replacement | West Haven, CT | $95,880 | Mar 31, 2024 | Jul 15, 2024 |
| 36C24124N0586 | Steam pipe fix off a BPA | West Haven, CT | $31,515 | Mar 22, 2024 | May 22, 2024 |
| 36C24124N0598 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $11,560 | Mar 22, 2024 | Apr 26, 2024 |
| 36C24124N0480 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $93,298 | Mar 15, 2024 | May 15, 2024 |
| 36C24124N0478 | Individual order limit increase and update vendors new business name and address_plumbing and steam fitters for VISN 1 | West Haven, CT | $168,320 | Feb 21, 2024 | May 20, 2024 |
| 36C24124N0426 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $61,676 | Feb 19, 2024 | Mar 18, 2024 |
| 36C24124N0375 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $44,941 | Feb 19, 2024 | Mar 18, 2024 |
| 36C24124C0027 | Steam trap replacement at Manchester VAMC | Bedford, MA | $1.2 million | Feb 13, 2024 | Aug 26, 2024 |
| 36C24124N0441 | AHU-19 steam and cooling coil replacement | Augusta, ME | $249,336 | Feb 12, 2024 | Oct 31, 2024 |
| 36C24124N0433 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $29,255 | Feb 9, 2024 | Feb 29, 2024 |
| 36C24124N0411 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $95,645 | Feb 2, 2024 | Mar 16, 2024 |
| 36C24124P0248 | Building 2 valve repair | West Haven, CT | $59,960 | Jan 29, 2024 | Feb 29, 2024 |
| 36C24124N0369 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $30,892 | Jan 29, 2024 | Feb 28, 2024 |
| 36C24124N0385 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $8,474 | Jan 26, 2024 | Feb 26, 2024 |
| 36C24124N0208 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $35,776 | Dec 4, 2023 | Dec 11, 2023 |
| 36C24124P0061 | Building 2 condensate line replacement | West Haven, CT | $39,746 | Nov 3, 2023 | Nov 17, 2023 |
| 36C24124P0034 | Replacement of pressure reducing valves | West Haven, CT | $268,762 | Oct 11, 2023 | Oct 21, 2023 |
| 36C24123P1292 | HVAC maintenance | Manchester, NH | $2.3 million | Sep 30, 2023 | Sep 29, 2027 |
| 36C24123C0089 | 523A4-22-011 VISN 1 rcx repairs wx | West Roxbury, MA | $542,835 | Sep 30, 2023 | Jul 12, 2024 |
| 36C24123N1336 | Plumbing and steam fitters for VISN 1 | Sidney, ME | $71,923 | Sep 29, 2023 | Oct 31, 2023 |
| 36C24123N1291 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $62,624 | Sep 18, 2023 | May 13, 2025 |
| 36C24123N1313 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $122,299 | Sep 16, 2023 | Sep 15, 2024 |
| 36C24123N1279 | Fire suppression design supply and install at the white river junction VAMC | White River Junction, VT | $17,593 | Sep 11, 2023 | Dec 31, 2023 |
| 36C24123C0081 | HVAC unit replacement at Manchester VAMC, nh | Manchester, NH | $1.0 million | Sep 6, 2023 | Mar 31, 2025 |
| 36C24123N1250 | Plumbing and steam fitters for VISN 1 | Leeds, MA | $71,664 | Sep 6, 2023 | Dec 31, 2023 |
| 36C24123N1045 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $92,932 | Aug 28, 2023 | Sep 13, 2023 |
| 36C24123N1108 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $45,786 | Aug 8, 2023 | Aug 31, 2023 |
| 36C24123N1209 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $22,023 | Aug 8, 2023 | Sep 29, 2023 |
| 36C24123N1052 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $58,955 | Jul 24, 2023 | Oct 31, 2023 |
| 36C24123P0882 | Cooling tower controller replacement and maintenance | West Haven, CT | $678,890 | Jul 5, 2023 | Nov 1, 2026 |
| 36C24123N0887 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $14,943 | Jun 27, 2023 | Aug 30, 2023 |
| 36C24123N0882 | Med gas repair | Sidney, ME | $15,907 | Jun 1, 2023 | May 31, 2024 |
| 36C24123P0756 | Dead leg removal | Leeds, MA | $201,153 | May 29, 2023 | Oct 31, 2023 |
| 36C24123N0666 | Steam line repair | Leeds, MA | $17,143 | Apr 21, 2023 | Jun 30, 2023 |
| 36C24123N0516 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $16,506 | Mar 30, 2023 | May 11, 2023 |
| 36C24123N0552 | Plumbing and steam fitters for VISN 1 | Newington, CT | $65,696 | Mar 24, 2023 | Jun 16, 2023 |
| 36C24123N0478 | Sump install and hook up | Leeds, MA | $47,319 | Mar 14, 2023 | May 31, 2023 |
| 36C24123N0484 | Plumbing and steam fitters for VISN 1 emergency replacement of steam-fired water heaters | West Haven, CT | $115,096 | Mar 3, 2023 | Apr 15, 2023 |
| 36C24123N0260 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $33,057 | Dec 15, 2022 | Jun 30, 2023 |
| 36C24123N0158 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $44,210 | Nov 15, 2022 | Dec 2, 2023 |
| 36C24123N0113 | Plumbing and steam fitters for VISN 1 | Leeds, MA | $76,970 | Oct 28, 2022 | Jun 30, 2023 |
| 36C24123N0094 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $130,580 | Oct 27, 2022 | Apr 21, 2023 |
| 36C24122N1005 | Replace heating pumps | West Haven, CT | $161,800 | Oct 3, 2022 | Jul 31, 2023 |
| 36C24122N0866 | Install saddle and 3 valve on 4 dcw line | Augusta, ME | $9,384 | Sep 13, 2022 | Sep 19, 2022 |
| 36C24122N0760 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $83,604 | Aug 8, 2022 | Dec 7, 2022 |
| 36C24122P0961 | Heater line repair | West Haven, CT | $19,286 | Aug 5, 2022 | Aug 4, 2023 |
| 36C24122P0751 | Feedwater service | Manchester, NH | $219,316 | Jun 28, 2022 | Jun 27, 2023 |
| 36C24122P0652 | Emg boiler repair | West Haven, CT | $149,848 | May 11, 2022 | May 15, 2022 |
| 36C24122N0512 | Plumbing and steam fitters for VISN 1 | Leeds, MA | $34,800 | Apr 29, 2022 | May 13, 2022 |
| 36C24122N0486 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $99,200 | Apr 19, 2022 | Dec 19, 2022 |
| 36C24122N0394 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $202,900 | Mar 16, 2022 | Dec 19, 2022 |
| 36C24122N0348 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $44,861 | Feb 28, 2022 | Jun 30, 2022 |
| 36C24122N0321 | Plumbing and steam fitters for VISN 1 | West Haven, CT | $132,405 | Feb 11, 2022 | Jun 30, 2022 |
| 36C24122N0298 | Plumbing and steam fitters for VISN 1 | Augusta, ME | $1,119 | Feb 8, 2022 | Apr 30, 2022 |