VA contract 36C24418P2432: Emergency water line repair
Ruthrauff Sauer, LLC held VA contract 36C24418P2432 for emergency water line repair in Pittsburgh, PA. It started on Mar 2, 2018, and $6,500 has been obligated so far. The VA received a single offer. This contract ended on Mar 16, 2018.
| Contract number | 36C24418P2432 |
|---|---|
| Contract holder | Ruthrauff Sauer, LLC |
| Holder UEI | UZS6PR231X14 |
| Description | Emergency water line repair |
| Location | Pittsburgh, PA |
| Contracting office | VA Network Contract Office 4 (36C244) |
| Obligated to date | $6,500 |
| Start date | Mar 2, 2018 |
| Current end date | Mar 16, 2018 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Construction |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Pittsburgh, PA
- 36C24426P0348: Boiler preventative maintenance and inspection services at the VA Pittsburgh healthcare system, $106,526, ends Jun 9, 2027
- 36C24424P0712: Chiller medium voltage variable speed drive repair, $6,388, ended Aug 9, 2024
- 36C24424P0593: Booster pump repairs, $7,566, ended May 29, 2024
- 36C24424P0425: Emergency chiller repair, $12,183, ended Jun 28, 2024
- 36C24424P0408: Emergency boiler repair of variable frequency drive (VFD) at the Pittsburgh VAMC heinz campus, $6,522, ended Jun 20, 2024
- 36C24423P0570: Repair water line, $14,762, ended Jun 15, 2023
- 36C24423P0448: Emergent cardiac cath supply fan repair - vaphs, $5,749, ended Apr 21, 2023
- 36C24421P0873: Air flow testing, $63,800, ended Sep 28, 2022
Other VA contracts held by Ruthrauff Sauer, LLC
- 36C78626P50242: Emergency sole source service to repair cracked backflow value that is critical for the operation of the cemetery irrigation system at ncota, $4,652, ended Jun 30, 2026
- 36C78625P0021: Urgent HVAC repairs, $3,300, ended Jul 31, 2025
- 36C24423P0570: Repair water line, $14,762, ended Jun 15, 2023
- 36C24422C0040: Emergency water main repair, $314,472, ended Aug 30, 2022
- 36C24421P0739: Emergency 8-INCH water line repair, $19,000, ended Sep 4, 2021
- 36C24418P3840: Emergency 8" water main repair, $6,350, ended Feb 11, 2019