VA contract 36C24621P0745: Emergency pipe repair
Jastar Mechanical, Inc. held VA contract 36C24621P0745 for emergency pipe repair in Hampton, VA. It started on Mar 23, 2021, and $20,720 has been obligated so far. The VA received a single offer. This contract ended on Apr 10, 2021.
| Contract number | 36C24621P0745 |
|---|---|
| Contract holder | Jastar Mechanical, Inc. |
| Holder UEI | M2T6PJ6M67M6 |
| Description | Emergency pipe repair |
| Location | Hampton, VA |
| Contracting office | VA Network Contract Office 6 (36C246) |
| Obligated to date | $20,720 |
| Start date | Mar 23, 2021 |
| Current end date | Apr 10, 2021 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Maintenance repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Hampton, VA
- 36C24626P0718: Fire sprinkler installation, $14,900, ended Aug 7, 2026
- 36C24625P0816: AC & heating emergency HVAC repairs, $16,950, ended Dec 30, 2025
- 36C24625P0074: Cooling tower chemical and HVAC maintenance, $191,461, ends Oct 31, 2026
- 36C24624C0044: Correct fca deficiencies in HVAC system, $1.8 million, ends Dec 31, 2026
- 36C24624P0623: Boiler safety device testing, $10,302, ended Feb 14, 2025
- 36C24623P1787: Emergency generator inspection, $248,025, ended Mar 2, 2026
- 36C24622C0060: Correct HVAC def, $1.8 million, ended Dec 5, 2025
- 36C24622P0903: Boiler and deaerator inspection base plus 4, $23,500, ends Apr 30, 2027
Other VA contracts held by Jastar Mechanical, Inc.
- 36C24622P0538: Emergency order for sewer line repair, $11,808, ended Feb 16, 2022
- 36C24621P0785: Emergency pipe repair building 110, $30,000, ended Apr 7, 2021
- 36C24621P0661: Emergency water purification system, $41,170, ended May 31, 2021
- 36C24621P0276: Emergency pipe repair, $13,083, ended Feb 8, 2021
- 36C24620P0994: Emergency beam insulation, $18,998, ended May 30, 2020
- 36C24620P0917: Emergency installation of domestic hot water system BLDG.116, $64,183, ended Apr 30, 2020
- 36C24620P0595: Emergency hot water pipe leaking, $6,000, ended Jan 27, 2020
- 36C24620P0499: Emergency hot water pipe leaking, $9,900, ended Mar 9, 2020