VA contract 36C24822P2295: Emergency replacement of two York air cooler chillers in...
Ost Services, LLC held VA contract 36C24822P2295 for emergency replacement of two York air cooler chillers in building 30 in Tampa, FL. It started on Sep 20, 2022, and $560,000 has been obligated so far. The VA received a single bid. This contract ended on May 31, 2023.
| Contract number | 36C24822P2295 |
|---|---|
| Solicitation number | 36C24822Q1711 |
| Contract holder | Ost Services, LLC |
| Holder UEI | MUPCLDFAHJK5 |
| Description | Emergency replacement of two York air cooler chillers in building 30 |
| Location | Tampa, FL |
| Contracting office | VA Network Contract Office 8 (36C248) |
| Obligated to date | $560,000 |
| Start date | Sep 20, 2022 |
| Current end date | May 31, 2023 |
| Bids received | 1 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed among eligible businesses (set-aside) |
| Kind of work | Construction |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Tampa, FL
- 36C24826P0597: Urgent domestic water pump skid building 1, $369,975, ends Apr 22, 2027
- 36C24826P0604: Replacement of supply and fuel lines in building 54, $58,084, ended Sep 22, 2026
- 36C24825P1992: Water treatment boiler and chiller, $328,836, ends Dec 14, 2026
- 36C24825P2129: Installation of domestic pump skid, $248,000, ended Sep 14, 2026
- 36C24825P0279: Emergency repair pressure reducing valve, $17,885, ended Dec 31, 2024
- 36C24824C0074: Replace AHU ED-203, $1.7 million, ends Nov 25, 2026
- 36C24824P1797: Emergency rental boiler installation for steam system shutdown, $48,500, ended Jul 29, 2024
- 36C24824P1258: Boiler inspection, testing and calibration service, $168,185, ends May 16, 2027
Other VA contracts held by Ost Services, LLC
- 36C24826P0597: Urgent domestic water pump skid building 1, $369,975, ends Apr 22, 2027
- 36C24825P2129: Installation of domestic pump skid, $248,000, ended Sep 14, 2026
- 36C24825P0279: Emergency repair pressure reducing valve, $17,885, ended Dec 31, 2024
- 36C24824P1797: Emergency rental boiler installation for steam system shutdown, $48,500, ended Jul 29, 2024
- 36C24824P0800: Replace roof top unit (RTU) BLDG T56, $38,650, ended May 10, 2024
- 36C24823P2051: Secondary pump #2 repair, $9,855, ended Jul 28, 2023
- 36C24823C0067: Install fan array AHU OR 2-7, $665,334, ended Apr 18, 2024
- 36C24823P1106: Emergency chiller and gear repair, $109,590, ended Jul 5, 2023