VA contract 36C25219P0425: Hepa filter replacement at Jesse Brown VAMC
Blue Yonder Inc held VA contract 36C25219P0425 for hepa filter replacement at Jesse Brown VAMC in Chicago, IL. It started on Jan 24, 2019, and $19,511 has been obligated so far. The VA received a single bid. This contract ended on Apr 19, 2019.
| Contract number | 36C25219P0425 |
|---|---|
| Contract holder | Blue Yonder Inc |
| Holder UEI | PTSCYLWKCFK3 |
| Description | Hepa filter replacement at Jesse Brown VAMC |
| Location | Chicago, IL |
| Contracting office | VA Network Contract Office 12 (36C252) |
| Obligated to date | $19,511 |
| Start date | Jan 24, 2019 |
| Current end date | Apr 19, 2019 |
| Bids received | 1 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Maintenance and repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Chicago, IL
- 36C25226P0534: Fire pump repacking - peerless fire pump, bed tower at Jesse Brown VAMC, $6,701, ends Oct 22, 2026
- 36C25226P0577: Emergency chiller chilled water repair service, $35,845, ended Sep 20, 2026
- 36C25226P0511: Air handler refurbishment for the Jesse Brown VAMC, Chicago, IL, $231,544, ends Nov 30, 2026
- 36C25226C0042: Requirement construction project 537-24-500, facility cooling upgrades, $4.4 million, ends Aug 9, 2027
- 36C25226P0407: NTP, $147,690, ends Oct 22, 2026
- 36C25225C0037: Vmu equipment tie in, $242,650, ended Dec 15, 2025
- 36C25225P0296: Dialysis and reverse osmosis testing maintenance, $819,895, ends Feb 28, 2030
- 36C25225P0233: BASE+4 backflow preventer service contract at the Jesse Brown VA medical center (537), $41,820, ends Jan 31, 2030
Other VA contracts held by Blue Yonder Inc
- 36C25226C0032: Construction contract for project 556-23-127 surgical HVAC systems replacement construction at the captain james a lovell federal health care center (FHCC), North Chicago, Illinois, $5.9 million, ends Jul 19, 2027
- 36C25225C0016: Project: 578-17-012 replace AHUS BLDG. 45, $4.4 million, ends Mar 23, 2027
- 36C25224P0763: Repairs of the VDF pumps, $2,933, ended Jul 31, 2025
- 36C25222C0042: Project 556-20-002: replace greenhouse hones HVAC at the North Chicago FHCC, $4.7 million, ended Mar 18, 2024
- 36C25220P0805: Repair of the secondary economizer fan at boiler plant and new controls at building 205 Hines VA hospital Hines, $42,180, ended Oct 31, 2020
- 36C25220P0787: The contractor shall provide air handling unit maintenance at the Jesse Brown VAMC located in Chicago, Illinois, $24,724, ended Sep 8, 2020
- 36C25219C0091: 537-18-136A AHU 5 follow-on: corrections to HVAC and BAS system for AHU 5, $1.6 million, ended Aug 28, 2020
- 36C25219C0055: Relocate blue pipe project calls for the relocation of a section of the 2 inch dialysis sanitary drain piping on the 3RD floor mechanical room of building 40 (BED tower). the added piping consists of 2 inch dialysis acid waste piping made of fire retardant polypropylene. pipe and fittings shall be joined using the no-hub method, utilizing plain end factory groove fittings joined with no-hub couplings, $25,409, ended May 8, 2019