VA contract 36C25622P0500: Inspection, testing and calibration of the boiler plant...
Venergy Group LLC held VA contract 36C25622P0500 for inspection, testing and calibration of the boiler plant burners, controls, and instruments by qualified technicians at the Shreveport, la VAMC in Shreveport, LA. It started on Mar 1, 2022, and $29,836 has been obligated so far. The VA received 5 offers. This contract ended on Feb 28, 2023. As a recurring service, the work has likely been solicited again; search SAM.gov for the follow-on. If every option is exercised, it could run until Feb 28, 2027.
| Contract number | 36C25622P0500 |
|---|---|
| Solicitation number | 36C25622Q0299 |
| Contract holder | Venergy Group LLC |
| Holder UEI | NWJ1Z3M5EAE5 |
| Description | Inspection, testing and calibration of the boiler plant burners, controls, and instruments by qualified technicians at the Shreveport, la VAMC |
| Location | Shreveport, LA |
| Contracting office | VA Network Contract Office 16 (36C256) |
| Obligated to date | $29,836 |
| Start date | Mar 1, 2022 |
| Current end date | Feb 28, 2023 |
| End date with all options | Feb 28, 2027 |
| Offers received | 5 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Recurring service |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Shreveport, LA
- 36C25626N0623: Testing, verification, calibration and adjustment of critical system- overton brooks VA medical center- EO14398, $28,386, ends Aug 31, 2027
- 36C25626C0010: Install isolation valves on domestic water system, B1, $379,535, ended Sep 28, 2026
- 36C25625P1603: Fire suppression testing and certification, $201,975, ends Sep 22, 2027
- 36C25625C0040: 667-25-200 replace the 1ST and 2ND floor boiler serving building 5, $459,352, ended Jan 11, 2026
- 36C25625C0038: Project 667-25-185 install vav boxes in surgery storage, Shreveport, la, $100,000, ended Oct 31, 2025
- 36C25625C0036: Project 667-25-811 emergency fire main repair and isolation valves replacement for the overton brooks VA medical center, Shreveport, la, $399,965, ended Jun 12, 2025
- 36C25625P0508: Quick response fire sprinkler installation services, $35,597, ended Jun 20, 2025
- 36C25625P0501: Repair boiler #3 hays Cleveland control system, $22,639, ended Feb 28, 2025
Other VA contracts held by Venergy Group LLC
- 36C24526P0662: Boiler safety upgrades, $43,456, ends Sep 24, 2027
- 36C25626N0623: Testing, verification, calibration and adjustment of critical system- overton brooks VA medical center- EO14398, $28,386, ends Aug 31, 2027
- 36C24526P0417: Cw pump repair, $325,750, ends May 19, 2027
- 36C25626N0287: Chiller support _ rental_ maintenance and services, $718,387, ends Apr 30, 2027
- 36C24526N0440: Ventilation testing and air balancing, $94,491, ended Sep 26, 2026
- 36C25625N1051: Testing, verification, calibration and adjustment of critical system overton brooks VA medical center, $29,498, ended Sep 2, 2026
- 36C24725P1143: HVAC repairs, $178,539, ended Aug 31, 2026
- 36C25925P0992: Boiler inspection, $12,097, ended Oct 15, 2025