VA contract 36C25721P1246: Re-Insulation of chilled water lines
Worldwide Construction Solutions LLC held VA contract 36C25721P1246 for re-Insulation of chilled water lines in Kerrville, TX. It started on Oct 22, 2021, and $15,660 has been obligated so far. The VA received 2 bids. This contract ended on Feb 8, 2022.
| Contract number | 36C25721P1246 |
|---|---|
| Solicitation number | 36C25721Q1124 |
| Contract holder | Worldwide Construction Solutions LLC |
| Holder UEI | KUVRFECVY2E9 |
| Description | Re-Insulation of chilled water lines |
| Location | Kerrville, TX |
| Contracting office | VA Network Contract Office 17 (36C257) |
| Obligated to date | $15,660 |
| Start date | Oct 22, 2021 |
| Current end date | Feb 8, 2022 |
| Bids received | 2 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Maintenance and repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Kerrville, TX
- 36C25726P0575: STX - Kerrville VA chiller maintenance services, $26,964, ends Jul 20, 2027
- 36C25725C0022: Project # 671A4-22-172 replace medical air & vac system, $363,036, ended Dec 5, 2025
- 36C77622N2365: Boiler safety testing and training, $8,680, ended Aug 18, 2022
- 36C25722P0456: Boiler efficiency institute for 3 thermal heaters and 3 steam generators. four honeywell ML7999 actuators, install one actuator, check/set combustion verify proper equipment operation clean work area perform repairs for an operational boiler plant, $146,149, ended Sep 30, 2022
- 36C25722P0345: Install gas heat unit building #119, $28,245, ended Mar 31, 2022
- 36C25721P1022: Chiller and cooling tower maintenance, $365,746, ended Jul 8, 2026
- 36C25720P1220: Demolish and remove existing 5-TON air conditioning package in accordance with the SOW, $10,931, ended Aug 28, 2020
- 36C25720P0598: Chiller control replacement parts and services, $17,959, ended Apr 30, 2020
Other VA contracts held by Worldwide Construction Solutions LLC
- 36C25721C0037: Chiller #3 replacement, $998,911, ended Oct 27, 2021
- 36C25720C0114: Replace med air system, $397,194, ended Nov 6, 2020