VA contract 36C25819C0149: Repair multiple water leaks at VA greater los Angeles
Sapper West, Inc. held VA contract 36C25819C0149 for repair multiple water leaks at VA greater los Angeles in Los Angeles, CA. It started on Sep 23, 2019, and $77,731 has been obligated so far. The VA received a single offer. This contract ended on Jul 11, 2020.
| Contract number | 36C25819C0149 |
|---|---|
| Solicitation number | 36C25819Q0454 |
| Contract holder | Sapper West, Inc. |
| Holder UEI | R7FJJUU2KHS4 |
| Description | Repair multiple water leaks at VA greater los Angeles |
| Location | Los Angeles, CA |
| Contracting office | Network Cntrct Off 22G (36C258) |
| Obligated to date | $77,731 |
| Start date | Sep 23, 2019 |
| Current end date | Jul 11, 2020 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Construction |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Los Angeles, CA
- 36C26226P1717: Repair condensate pumps in bldg. 200, $27,346, ends Mar 20, 2027
- 36C26226P1776: Replace refrigerant in chillers, $35,930, ends Jan 10, 2027
- 36C26226P1672: Relief valve and jockey pump repairs, $4,926, ends Dec 1, 2026
- 36C26226C0319: Emergency cooling tower remediation, $99,475, ends Nov 18, 2026
- 36C26226P1398: High pressure steam piping replacement, $60,958, ends Nov 16, 2026
- 36C26226P1306: Emergency boiler plant and CEMS preventative maintenance and inspection services, $388,938, ends Oct 21, 2026
- 36C26226C0252: Replacement of hot water systems, $717,635, ends Jan 13, 2027
- 36C26226P1191: Air handling unit replacement, $121,700, ends Oct 29, 2026
Other VA contracts held by Sapper West, Inc.
- 36C26225P1799: Emergency piping repair (stop line), $20,610, ended Jul 31, 2025
- 36C26225P0961: Emergency pipe system repairs, $17,415, ended Apr 11, 2025
- 36C26223P1603: This is an emergency request to repair a leak on a 3" copper domestic hot water line located in B-500 mts sub-basement on RISER#9 this is an ongoing water leak and needs to be repaired immediately, this will require a line stop procedure, $8,883, ended Jun 30, 2023
- 36C26222C0223: Project: 691A4-19-201, replace B99 HVAC at the sepulveda VA medical center campus in north hills, ca 91343, $5.1 million, ended Oct 31, 2025
- 36C78622C0060: Sprinkler head replacement at rnc, $998,191, ended Oct 13, 2023
- 36C26222P2173: **emergency** B36 waterline repairs, $48,386, ended Sep 30, 2022
- 36C26222P1510: **emergency** infection control barrier C101-102, $135,259, ended Aug 12, 2022
- 36C26222P1537: **emergency** pipe break B209, $23,194, ended Jul 6, 2022