VA contract 36C26219P1546: Services to repair boiler piping at VA greater Los...
Premier Logistical Center, Inc. held VA contract 36C26219P1546 for services to repair boiler piping at VA greater Los Angeles healthcare system, Los Angeles, CA 90073 in Los Angeles, CA. It started on Jul 18, 2019, and $26,984 has been obligated so far. The VA received 3 bids. This contract ended on Dec 31, 2019.
| Contract number | 36C26219P1546 |
|---|---|
| Solicitation number | 36C26219Q0794 |
| Contract holder | Premier Logistical Center, Inc. |
| Holder UEI | WK2NKV9TFJE4 |
| Description | Services to repair boiler piping at VA greater Los Angeles healthcare system, Los Angeles, CA 90073 |
| Location | Los Angeles, CA |
| Contracting office | VA Network Contract Office 22 (36C262) |
| Obligated to date | $26,984 |
| Start date | Jul 18, 2019 |
| Current end date | Dec 31, 2019 |
| Bids received | 3 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Maintenance and repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Los Angeles, CA
- 36C26226P1717: Repair condensate pumps in BLDG. 200, $27,346, ends Mar 20, 2027
- 36C26226P1776: Replace refrigerant in chillers, $35,930, ends Jan 10, 2027
- 36C26226P1672: Relief valve and jockey pump repairs, $4,926, ends Dec 1, 2026
- 36C26226C0319: Emergency cooling tower remediation, $99,475, ends Nov 18, 2026
- 36C26226P1398: High pressure steam piping replacement, $60,958, ends Nov 16, 2026
- 36C26226P1306: Emergency boiler plant and CEMS preventative maintenance and inspection services, $388,938, ends Oct 21, 2026
- 36C26226C0252: Replacement of hot water systems, $717,635, ends Jan 13, 2027
- 36C26226P1191: Air handling unit replacement, $121,700, ends Oct 29, 2026