VA contract 36C26219P1816: Service to replace rooftop mounted A/C unit, building...
Earthtek Builders held VA contract 36C26219P1816 for service to replace rooftop mounted A/C unit, building 114 VA greater Los Angeles healthcare system in Los Angeles, CA. It started on Aug 14, 2019, and $10,700 has been obligated so far. The VA received a single bid. This contract ended on Sep 4, 2019. If every option is exercised, it could run until Sep 13, 2019.
| Contract number | 36C26219P1816 |
|---|---|
| Contract holder | Earthtek Builders |
| Holder UEI | MU1DKEN7PM49 |
| Description | Service to replace rooftop mounted A/C unit, building 114 VA greater Los Angeles healthcare system |
| Location | Los Angeles, CA |
| Contracting office | VA Network Contract Office 22 (36C262) |
| Obligated to date | $10,700 |
| Start date | Aug 14, 2019 |
| Current end date | Sep 4, 2019 |
| End date with all options | Sep 13, 2019 |
| Bids received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed (simplified acquisition) |
| Kind of work | Installation |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Los Angeles, CA
- 36C26226P1717: Repair condensate pumps in BLDG. 200, $27,346, ends Mar 20, 2027
- 36C26226P1776: Replace refrigerant in chillers, $35,930, ends Jan 10, 2027
- 36C26226P1672: Relief valve and jockey pump repairs, $4,926, ends Dec 1, 2026
- 36C26226C0319: Emergency cooling tower remediation, $99,475, ends Nov 18, 2026
- 36C26226P1398: High pressure steam piping replacement, $60,958, ends Nov 16, 2026
- 36C26226P1306: Emergency boiler plant and CEMS preventative maintenance and inspection services, $388,938, ends Oct 21, 2026
- 36C26226C0252: Replacement of hot water systems, $717,635, ends Jan 13, 2027
- 36C26226P1191: Air handling unit replacement, $121,700, ends Oct 29, 2026
Other VA contracts held by Earthtek Builders
- 36C26221P0498: Replace twelve (12) chiller condenser coils, BLDG. 206 chiller, VA greater Los Angeles healthcare system, $75,600, ended Apr 8, 2021
- 36C26220P1829: Sepulveda sewer repair, $26,000, ended Sep 30, 2020
- 36C26220P1552: Sepulveda hot water boiler BLDG 62, $169,500, ended Oct 31, 2020
- 36C25819C0141: Replacement of B99 domestic hot water at VA greater Los Angeles, $295,000, ended Feb 9, 2021