VA contract 36C26222P1192: Repair pipe break
D Square Construction LLC held VA contract 36C26222P1192 for repair pipe break in Los Angeles, CA. It started on Apr 26, 2022, and $4,824 has been obligated so far. The VA received a single offer. This contract ended on Jun 25, 2022.
| Contract number | 36C26222P1192 |
|---|---|
| Contract holder | D Square Construction LLC |
| Holder UEI | K514LY25RBX5 |
| Description | Repair pipe break |
| Location | Los Angeles, CA |
| Contracting office | VA Network Contract Office 22 (36C262) |
| Obligated to date | $4,824 |
| Start date | Apr 26, 2022 |
| Current end date | Jun 25, 2022 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Maintenance repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Los Angeles, CA
- 36C26226P1717: Repair condensate pumps in bldg. 200, $27,346, ends Mar 20, 2027
- 36C26226P1776: Replace refrigerant in chillers, $35,930, ends Jan 10, 2027
- 36C26226P1672: Relief valve and jockey pump repairs, $4,926, ends Dec 1, 2026
- 36C26226C0319: Emergency cooling tower remediation, $99,475, ends Nov 18, 2026
- 36C26226P1398: High pressure steam piping replacement, $60,958, ends Nov 16, 2026
- 36C26226P1306: Emergency boiler plant and CEMS preventative maintenance and inspection services, $388,938, ends Oct 21, 2026
- 36C26226C0252: Replacement of hot water systems, $717,635, ends Jan 13, 2027
- 36C26226P1191: Air handling unit replacement, $121,700, ends Oct 29, 2026
Other VA contracts held by D Square Construction LLC
- 36C26225C0195: Special repair: backflow preventer testing, certification, & repair, $36,000, ended May 18, 2026
- 36C26225P0705: Water main pipe repair, $7,885, ended Sep 30, 2025
- 36C26224P0362: Repair/correct wagd, $10,000, ended Sep 30, 2024
- 36C26223P2420: Emergency pipe repair, $17,095, ended Nov 30, 2023
- 36C26223P1287: Roof top steam repair, $51,661, ended Sep 30, 2023
- 36C26223P1120: This procurement was for the emergency repair of the 12" irrigation line located at the north side of the west los Angeles VA medical campus, $13,331, ended Apr 30, 2023
- 36C26223P0113: Emergency actin- repair water damage and leak mitigation, $29,765, ended Dec 31, 2022
- 36C26222P1784: **emergency** e main sewer riser repairs, $402,308, ended Dec 31, 2022