VA contract 36C26321P0376: Chiller and boiler water system treatment
Championx LLC held VA contract 36C26321P0376 for chiller and boiler water system treatment in Minneapolis, MN. It started on Mar 29, 2021, and $39,841 has been obligated so far. The VA received a single bid. This contract ended on Jun 30, 2021.
| Contract number | 36C26321P0376 |
|---|---|
| Solicitation number | 36C26321Q0253 |
| Contract holder | Championx LLC |
| Holder UEI | C4YKGCWMBAR6 |
| Description | Chiller and boiler water system treatment |
| Location | Minneapolis, MN |
| Contracting office | VA Network Contract Office 23 (36C263) |
| Obligated to date | $39,841 |
| Start date | Mar 29, 2021 |
| Current end date | Jun 30, 2021 |
| Bids received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Maintenance and repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Minneapolis, MN
- 36C26326N0637: Base year order 8/16/26 - 8/14/27 backflow preventer testing, $23,200, ends Aug 14, 2027
- 36C26326P0535: Emergency chiller repairs at the Minneapolis VA, $228,225, ended Sep 4, 2026
- 36C26326C0012: 618-24-115 replace coil mau #3 and #38 provide labor and materials to complete work per contract documents, $255,000, ended May 18, 2026
- 36C26325C0062: 618-25-202 replace chiller #4 provide a labor and materials to complete work per contract documents, $1.7 million, ended Aug 16, 2026
- 36C26325P0981: Emergency cooling tower # 2 repair services at the Minneapolis VA medical center, $20,660, ended Aug 31, 2025
- 36C26325P0716: Boiler inspections and maintenance, $163,775, ended Apr 30, 2026
- 36C26324P0882: Repair to replace balancing valve on cooling tower #4 located in BLDG 69 (energy center) at the Minneapolis VAMC, $5,300, ended Jul 12, 2024
- 36C78624P50062: This apr is for an emergency repair to the failed heating system in building 1002 (PIC) at FSNC (894). funding for this repair has been approved by MWD - m & r# 24-003. please see attached quotes and documents, $7,607, ended Jan 8, 2024