VA contract 36C24222P1117: Batavia VA medical center urgent repair of a multistack...
Robert L Kistler Service Corporation held VA contract 36C24222P1117 for batavia VA medical center urgent repair of a multistack MODEL:MS015XC2A2W2AAC-R410A for the c-ward chiller in Batavia, NY. It started on Jul 1, 2022, and $7,193 has been obligated so far. The VA received a single offer. This contract ended on Aug 30, 2022.
| Contract number | 36C24222P1117 |
|---|---|
| Solicitation number | NONE |
| Contract holder | Robert L Kistler Service Corporation |
| Holder UEI | DGLTCZ9E5ML3 |
| Description | Batavia VA medical center urgent repair of a multistack MODEL:MS015XC2A2W2AAC-R410A for the c-ward chiller |
| Location | Batavia, NY |
| Contracting office | VA Network Contract Office 2 (36C242) |
| Obligated to date | $7,193 |
| Start date | Jul 1, 2022 |
| Current end date | Aug 30, 2022 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Maintenance repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Batavia, NY
- 36C24225P0292: Emergency water main repair, $58,108, ended Dec 10, 2024
- 36C24223P1296: Batavia, ny VAMC fire sprinkler systems preventative maintenance, base + 2, $69,954, ended Jul 31, 2026
- 36C24223P0596: Emergency water main repair, $59,495, ended Feb 20, 2023
- 36C24223C0058: Improve potable water dist, $3.8 million, ended Aug 31, 2026
- 36C24221P1091: Urgent chiller repair at the Batavia VA medical center, $7,850, ended Aug 24, 2021
- 36C24219P1302: Upgradethe current infrared scanners on 4 cleaver brooks boilers with uv self-checking scanners, $15,907, ended Sep 30, 2019
- 36C24219P0849: Batavia boiler repairs and maintenance to 4 boilers. in addition: re-stroke all air dampers and oil valve low fire switches that need adjustments, and/or out of specification. ? install current relays on all three 3 blower motor legs, and tie into 3-P limit string. ? furnish and install new stack damper actuator and pin outlet exhaust damper to shaft. ? recalibrate O2 sensors. ? drill and pin fuel oil control valve actuators. boiler 2 furnish and install new warrick lwco HEAD furnish and install new asco upstream pilot solenoid valve o boiler 3 furnish and install new main vent valve on the gas train VALVE furnish and install new asco upstream pilot solenoid valve o boiler 4 furnish and install new asco upstream pilot solenoid valve, $29,199, ended May 10, 2019
- VA24217C0068: Remove dead water legs Batavia, ny VAMC, $10,991, ended Sep 22, 2021