VA contract VA24217C0068: Remove dead water legs Batavia, NY VAMC
Welch Construction Inc. held VA contract VA24217C0068 for remove dead water legs Batavia, NY VAMC in Batavia, NY. It started on Mar 30, 2017, and $10,991 has been obligated so far. The VA received 6 bids. This contract ended on Sep 22, 2021.
| Contract number | VA24217C0068 |
|---|---|
| Solicitation number | VA242-17-B-0224 |
| Contract holder | Welch Construction Inc. |
| Holder UEI | N78KKEV1N7V7 |
| Description | Remove dead water legs Batavia, NY VAMC |
| Location | Batavia, NY |
| Contracting office | VA Network Contract Office 2 (36C242) |
| Obligated to date | $10,991 |
| Start date | Mar 30, 2017 |
| Current end date | Sep 22, 2021 |
| Bids received | 6 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed among eligible businesses (set-aside) |
| Kind of work | Maintenance and repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Batavia, NY
- 36C24225P0292: Emergency water main repair, $58,108, ended Dec 10, 2024
- 36C24223P1296: Batavia, NY VAMC fire sprinkler systems preventative maintenance, base + 2, $69,954, ended Jul 31, 2026
- 36C24223P0596: Emergency water main repair, $59,495, ended Feb 20, 2023
- 36C24223C0058: Improve potable water dist, $3.8 million, ended Aug 31, 2026
- 36C24222P1117: Batavia VA medical center urgent repair of a multistack MODEL:MS015XC2A2W2AAC-R410A for the c-ward chiller, $7,193, ended Aug 30, 2022
- 36C24221P1091: Urgent chiller repair at the Batavia VA medical center, $7,850, ended Aug 24, 2021
- 36C24219P1302: Upgradethe current infrared scanners on 4 cleaver brooks boilers with UV self-checking scanners, $15,907, ended Sep 30, 2019
- 36C24219P0849: Batavia boiler repairs and maintenance to 4 boilers. in addition: re-stroke all air dampers and oil valve low fire switches that need adjustments, and/or out of specification. ? install current relays on all three 3 blower motor legs, and tie into 3-P limit string. ? furnish and install new stack damper actuator and pin outlet exhaust damper to shaft. ? recalibrate O2 sensors. ? drill and pin fuel oil control valve actuators. boiler 2 furnish and install new warrick lwco HEAD furnish and install new asco upstream pilot solenoid valve o boiler 3 furnish and install new main vent valve on the gas train VALVE furnish and install new asco upstream pilot solenoid valve o boiler 4 furnish and install new asco upstream pilot solenoid valve, $29,199, ended May 10, 2019
Other VA contracts held by Welch Construction Inc.
- 36C24226C0024: Replace steam coils at the Syracuse VAMC, $1.4 million, ends Dec 26, 2026
- 36C24225C0031: Replace AHU 2-7- and 11, $6.8 million, ends May 26, 2027
- 36C24223C0060: Upgrade to SPS HVAC system, $687,740, ended Sep 29, 2023
- 36C24221C0083: AHU replacement, $5.1 million, ended Jan 23, 2025
- 36C24221C0059: Upgrade ventilation, B-76, $5.2 million, ended Feb 23, 2024
- 36C24218C0086: Other function replace AHU 5, $1.2 million, ended Jun 4, 2019