VA contract 36C24223P1296: Batavia, ny VAMC fire sprinkler systems preventative...
Johnson Controls Fire Protection LP held VA contract 36C24223P1296 for batavia, ny VAMC fire sprinkler systems preventative maintenance, base + 2 in Batavia, NY. It started on Aug 1, 2023, and $69,954 has been obligated so far. The VA received a single offer. This contract ended on Jul 31, 2026. As a recurring service, the work has likely been solicited again; search SAM.gov for the follow-on.
| Contract number | 36C24223P1296 |
|---|---|
| Solicitation number | 36C24223Q0829 |
| Contract holder | Johnson Controls Fire Protection LP |
| Holder UEI | K9HJHLAKXE96 |
| Description | Batavia, ny VAMC fire sprinkler systems preventative maintenance, base + 2 |
| Location | Batavia, NY |
| Contracting office | VA Network Contract Office 2 (36C242) |
| Obligated to date | $69,954 |
| Start date | Aug 1, 2023 |
| Current end date | Jul 31, 2026 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed (simplified acquisition) |
| Kind of work | Recurring service |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Batavia, NY
- 36C24225P0292: Emergency water main repair, $58,108, ended Dec 10, 2024
- 36C24223P0596: Emergency water main repair, $59,495, ended Feb 20, 2023
- 36C24223C0058: Improve potable water dist, $3.8 million, ended Aug 31, 2026
- 36C24222P1117: Batavia VA medical center urgent repair of a multistack MODEL:MS015XC2A2W2AAC-R410A for the c-ward chiller, $7,193, ended Aug 30, 2022
- 36C24221P1091: Urgent chiller repair at the Batavia VA medical center, $7,850, ended Aug 24, 2021
- 36C24219P1302: Upgradethe current infrared scanners on 4 cleaver brooks boilers with uv self-checking scanners, $15,907, ended Sep 30, 2019
- 36C24219P0849: Batavia boiler repairs and maintenance to 4 boilers. in addition: re-stroke all air dampers and oil valve low fire switches that need adjustments, and/or out of specification. ? install current relays on all three 3 blower motor legs, and tie into 3-P limit string. ? furnish and install new stack damper actuator and pin outlet exhaust damper to shaft. ? recalibrate O2 sensors. ? drill and pin fuel oil control valve actuators. boiler 2 furnish and install new warrick lwco HEAD furnish and install new asco upstream pilot solenoid valve o boiler 3 furnish and install new main vent valve on the gas train VALVE furnish and install new asco upstream pilot solenoid valve o boiler 4 furnish and install new asco upstream pilot solenoid valve, $29,199, ended May 10, 2019
- VA24217C0068: Remove dead water legs Batavia, ny VAMC, $10,991, ended Sep 22, 2021
Other VA contracts held by Johnson Controls Fire Protection LP
- 36C24626P1086: CLC kitchen replacement, $10,252, ends Dec 13, 2026
- 36C24426C0016: Repair of sprinkler system, $17,003, ended Dec 25, 2025
- 36C25224P1245: Repair, install components, and test sprinkler systems in bldg.'s 14, 58, 102, and 104 as indicated in the sow, at the VA illiana health care center in Danville, il, $34,521, ended Jan 30, 2025
- 36C25224P0882: For the one-time emergency fire sprinkler & ct circuit board upgrade at the jesse brown VA medical center located at 820 s. damen avenue, Chicago il 60612-4223, $9,633, ended Dec 31, 2024
- 36C25224P0623: Testing and inspection of fire sprinkler system, $29,526, ends May 31, 2029
- 36C25224P0729: For the one-time emergency fire suppression valce repair at the jesse brown VA medical center, $10,577, ended Sep 30, 2024
- 36C24924C0058: Compressor replacement, $47,283, ended Aug 15, 2024
- 36C25624P0643: Repair central riser 9TH floor, $4,059, ended Mar 8, 2024