Richard Group LLC (UEI QST7A5N63TL4) has won 10 VA heating, cooling and plumbing contracts since October 2018, worth $25.5 million, at 6 locations. 0 are still active.
Where does Richard Group LLC work for the VA?
- Iron Mountain, MI: 3 contracts
- Milwaukee, WI: 2 contracts
- Danville, IL: 2 contracts
- North Chicago, IL: 1 contract
- Chicago, IL: 1 contract
- Hines, IL: 1 contract
Contracts
| Contract | Description | Location | Obligated | Start | End |
|---|---|---|---|---|---|
| 36C25221C0108 | Sealed bid award for project 695-19-104, replace fire sprinklers at the Milwaukee VA | Milwaukee, WI | $1.3 million | Sep 24, 2021 | Sep 1, 2023 |
| 36C25221C0100 | Project 585-20-111 low pressure steam riser at oscar g johnson VA medical center, iron mountain, mi | Iron Mountain, MI | $1.1 million | Sep 1, 2021 | Sep 26, 2022 |
| 36C25221P0323 | Replacement of condenser pump at captain james a. lovell federal health care center north Chicago | North Chicago, IL | $42,245 | Jan 20, 2021 | Mar 31, 2021 |
| 36C25220C0201 | 537-18-301B. legionella corrections | Chicago, IL | $2.0 million | Sep 30, 2020 | Sep 25, 2022 |
| 36C25220C0199 | Ifb and contract for project 695-19-114, upgrade plumbing for legionella prevention | Milwaukee, WI | $8.8 million | Jul 30, 2020 | Jun 8, 2026 |
| 36C25219C0136 | Upgrade heat exchangers and replace perimeter heat at oscar g. johnson VA medical center, iron mountain, mi | Iron Mountain, MI | $2.5 million | May 8, 2019 | Oct 15, 2020 |
| 36C25219C0131 | Upgrade AHU 10&11 construction at the oscar g johnson VA medical center, iron mountain, mi 49801 | Iron Mountain, MI | $1.4 million | Apr 30, 2019 | Jan 23, 2020 |
| 36C25219C0045 | Ot:igf:ot correct boiler safety deficiencies | Danville, IL | $1.3 million | Dec 27, 2018 | Nov 15, 2019 |
| 36C10X18P0195 | The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to remove and replace a total of one hundred fifty-four (154) high-efficiency heat pumps of brand name OR equal to section b heat pump data matrix (office setting) and digital ats/temperature sensors that are building automation and control network (bacnet) compatible. units shall be compatible with existing digital data controller (DDC) system and software (alerton building suite V2.6) | Hines, IL | $2.0 million | Sep 26, 2018 | Sep 25, 2019 |
| 36C25218C0196 | Contractor shall provide all labor, materials, equipment, supervision, and all other resources necessary to construct per plans and specifications project 550-15-107, remediate legionella station-wide PHASE-1. the scope of this project is to replace the domestic water distribution system in building 58 and to install a continuous water monitoring system in buildings 39, 58, 101, 103, 128, 129, 130 and 131 | Danville, IL | $5.2 million | Jun 29, 2018 | Sep 25, 2020 |