VA contract 36C25221C0100: Project 585-20-111 low pressure steam riser at oscar g...
Richard Group LLC held VA contract 36C25221C0100 for project 585-20-111 low pressure steam riser at oscar g johnson VA medical center, iron mountain, mi in Iron Mountain, MI. It started on Sep 1, 2021, and $1.1 million has been obligated so far. The VA received a single offer. This contract ended on Sep 26, 2022. As a recurring service, the work has likely been solicited again; search SAM.gov for the follow-on.
| Contract number | 36C25221C0100 |
|---|---|
| Solicitation number | 36C25221B0017 |
| Contract holder | Richard Group LLC |
| Holder UEI | QST7A5N63TL4 |
| Description | Project 585-20-111 low pressure steam riser at oscar g johnson VA medical center, iron mountain, mi |
| Location | Iron Mountain, MI |
| Contracting office | VA Network Contract Office 12 (36C252) |
| Obligated to date | $1.1 million |
| Start date | Sep 1, 2021 |
| Current end date | Sep 26, 2022 |
| Offers received | 1 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed among eligible businesses (set-aside) |
| Kind of work | Recurring service |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in Iron Mountain, MI
- 36C25226C0025: Replace condensate lines and pumps at the oscar g johnson VAMC at iron mountain, mi, $1.4 million, ends Oct 20, 2026
- 36C25225P1115: Emergency storm water main repair at the oscar g. johnson VA medical center in iron mountain mi, $22,250, ended Sep 8, 2025
- 36C25224P0623: Testing and inspection of fire sprinkler system, $29,526, ends May 31, 2029
- 36C25224P0246: Building automation system maintenance at oscar johnson VA medical center, iron mountain, mi, $69,401, ends Mar 31, 2029
- 36C77623N0458: Boiler safety testing and training, $11,412, ended Jun 30, 2024
- 36C25223C0023: Project 585-21-116 replace chiller plant (phase 2). this project involves the replacement of three of the existing 250-TON chillers for future cooling demand, $5.3 million, ended Feb 28, 2026
- 36C25222P0767: Project 58521-116 - replace chiller plant construction at the oscar g. johnson VA medical center in iron mountain, mi, $344,000, ended Apr 12, 2023
- 36C25222C0025: Project 585-19-118 includes the installation of new potable risers and associated isolation valves to the cold, hot and hot water return piping at the oscar g. johnson VA medical center in iron mountain, mi, $3.7 million, ended Aug 10, 2023
Other VA contracts held by Richard Group LLC
- 36C25221C0108: Sealed bid award for project 695-19-104, replace fire sprinklers at the Milwaukee VA, $1.3 million, ended Sep 1, 2023
- 36C25221P0323: Replacement of condenser pump at captain james a. lovell federal health care center north Chicago, $42,245, ended Mar 31, 2021
- 36C25220C0201: 537-18-301B. legionella corrections, $2.0 million, ended Sep 25, 2022
- 36C25220C0199: Ifb and contract for project 695-19-114, upgrade plumbing for legionella prevention, $8.8 million, ended Jun 8, 2026
- 36C25219C0136: Upgrade heat exchangers and replace perimeter heat at oscar g. johnson VA medical center, iron mountain, mi, $2.5 million, ended Oct 15, 2020
- 36C25219C0131: Upgrade AHU 10&11 construction at the oscar g johnson VA medical center, iron mountain, mi 49801, $1.4 million, ended Jan 23, 2020
- 36C25219C0045: Ot:igf:ot correct boiler safety deficiencies, $1.3 million, ended Nov 15, 2019
- 36C10X18P0195: The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to remove and replace a total of one hundred fifty-four (154) high-efficiency heat pumps of brand name OR equal to section b heat pump data matrix (office setting) and digital ats/temperature sensors that are building automation and control network (bacnet) compatible. units shall be compatible with existing digital data controller (DDC) system and software (alerton building suite V2.6), $2.0 million, ended Sep 25, 2019