VA contract 36C25221P0323: Replacement of condenser pump at captain james a. lovell...
Richard Group LLC held VA contract 36C25221P0323 for replacement of condenser pump at captain james a. lovell federal health care center North Chicago in North Chicago, IL. It started on Jan 20, 2021, and $42,245 has been obligated so far. The VA received a single bid. This contract ended on Mar 31, 2021.
| Contract number | 36C25221P0323 |
|---|---|
| Solicitation number | 36C25221Q0295 |
| Contract holder | Richard Group LLC |
| Holder UEI | QST7A5N63TL4 |
| Description | Replacement of condenser pump at captain james a. lovell federal health care center North Chicago |
| Location | North Chicago, IL |
| Contracting office | VA Network Contract Office 12 (36C252) |
| Obligated to date | $42,245 |
| Start date | Jan 20, 2021 |
| Current end date | Mar 31, 2021 |
| Bids received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed (simplified acquisition) |
| Kind of work | Installation |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them. See something wrong in our summary? Report a problem with this contract.
Other VA HVAC and plumbing contracts in North Chicago, IL
- 36C25226P0574: Provide heating system piping repairs at FHCC building 134 penthouse, North Chicago, IL, $99,031, ends Dec 31, 2026
- 36C25226C0026: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. EO 14398, $4.0 million, ends Dec 31, 2026
- 36C25226C0032: Construction contract for project 556-23-127 surgical HVAC systems replacement construction at the captain james a lovell federal health care center (FHCC), North Chicago, Illinois, $5.9 million, ends Jul 19, 2027
- 36C25226P0440: Emergency fire alarm system testing inspection and repair service, $486,896, ended Sep 30, 2026
- 36C25226P0119: Emergent fire water utility repair at the FHCC in North Chicago, $36,100, ended Feb 15, 2026
- 36C25225P1275: PM and repair hot water bundle services, $356,320, ends Aug 31, 2027
- 36C25225C0052: Construction project 556-24-106 replace chiller no. 2 at captain james a. lovell federal health care center North Chicago, IL 60064-3048, $2.1 million, ends Oct 31, 2026
- 36C25225P0230: Emergency - fire pump and valve repair near building 135, $161,608, ended Jul 17, 2025
Other VA contracts held by Richard Group LLC
- 36C25221C0108: Sealed bid award for project 695-19-104, replace fire sprinklers at the Milwaukee VA, $1.3 million, ended Sep 1, 2023
- 36C25221C0100: Project 585-20-111 low pressure steam riser at oscar g johnson VA medical center, Iron Mountain, MI, $1.1 million, ended Sep 26, 2022
- 36C25220C0201: 537-18-301B. legionella corrections, $2.0 million, ended Sep 25, 2022
- 36C25220C0199: Ifb and contract for project 695-19-114, upgrade plumbing for legionella prevention, $8.8 million, ended Jun 8, 2026
- 36C25219C0136: Upgrade heat exchangers and replace perimeter heat at oscar g. johnson VA medical center, Iron Mountain, MI, $2.5 million, ended Oct 15, 2020
- 36C25219C0131: Upgrade AHU 10&11 construction at the oscar g johnson VA medical center, Iron Mountain, MI 49801, $1.4 million, ended Jan 23, 2020
- 36C25219C0045: Correct boiler safety deficiencies, $1.3 million, ended Nov 15, 2019
- 36C10X18P0195: The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to remove and replace a total of one hundred fifty-four (154) high-efficiency heat pumps of brand name OR equal to section b heat pump data matrix (office setting) and digital ats/temperature sensors that are building automation and control network (bacnet) compatible. units shall be compatible with existing digital data controller (DDC) system and software (alerton building suite V2.6), $2.0 million, ended Sep 25, 2019